We In this way, our merchandise have continued to achieve industry acceptance and clients gratification above the past few many years.- EPG Group the most significant agricultural gearbox and pto factory in China with 5 different branches. For a lot more specifics: Mobile/whatsapp/telegram/Kakao us at: 0086-13083988828
PP PE agricultural Dewater extrusion Machine is mainly used for drying the film.
Wor ept basic principle and software
With the screw pressure to dewater the drinking water from the content, Washed plastic film, agriculture movie, PP woven bag, large pac ept bag,PE farm movie,ton luggage, nylon etc, can be dewater from this machine. Particular developed screw and gearbox can be dry the substance very nicely. When use this content pelletizing or granulation, the potential will be a lot increased, it can dewater far more than ninety five%-ninety nine.5%. (Up to consumer requirement, the content can be plastizing or fifty percent plastizing)
Advantage of this machine
1. Special made screw and force way, can dry the material a lot much more much better than typical device
two. Dewater: can be ninety eight%
three. Advantage complex, lower energy, reduced sounds, straightforward to run, safty and value resonable
four. This Mechnical force dewater, examine with hot wind dryer program, this machine can preserve space and electrical power
Undertaking summary:
NO. | Product. | Spec. |
one | Materials | washed PP ,PE film |
two | Potential | output:600-800kg/hr |
three | Electrical power power | 380V,50Hz,3 Section |
four | Ultimately products moisture | ≤2% |
five | Set up electricity | 150KW for entire plant |
6 | Power usage | 70% of installed energy |
7 | Plant area | > 36 Sq. meter > 3 meter top Estimate line size: 6m(Length)* 2 m(Width)* 3 m(Peak) we can make the line switch as I or L condition to in shape the buyer’s plant |
8 | Manpower | one-2 Individuals necessary |
9 | Payment terms | thirty% by TT as deposit Stability compensated by TT just before cargo. |
Shipping and delivery time | forty Wor ept days considering that receive the deposit | |
Package deal | Pac ept by movie. | |
Guarantee Interval | 12months because the day of BL. | |
Shipping and delivery | By sea | |
Supply validity | 60Days |
Equipment photoes
Screw and barrle inside of the machine
Die of the machine
Device beneath producting
Final material right after the machine
Device all parts:
Item NO. | Merchandise title | Amount | Electricity |
one | Belt conveyer | 1 set | 2.2kW |
two | Main machine | 1set | 110kw |
3 | Pelletizing | one set | five.5kw |
4 | Wind transmission method | 1 established | 5.5kw |
five | Storage Silo | one established | _ |
6 | Electrical control box | one established | _ |
Kindly really feel cost-free to contact me for more specifics of the machine.
1. We source beneath needed paperwork with the machine:
- Machine layout
- Electrical power diagram
- Device certificate
- Basic handbook book/routine maintenance e-book
2. We gives a single-calendar year high quality promise. In the course of this period of time, if the machine’s malfunction is accredited to be our responsibility, we will send the damaged spare components to you with DHL courier or other way inside of 7 workdays soon after receiving the complainant. And send the technicians to the buyer’s manufacturing unit for sustaining. All fees are in our account.
3. Soon after one calendar year assure, If you need to have we can provides payable spare areas and technician’s Checking out maintenance, and any damaged spares we can send you soon as attainable.
four. We have faith in that our quotation satisfies with your demands and we will gladly furnish you with even more data.
five. 24Hours provider : Cell+86-13915707468
The use of original gear manufacturer’s (OEM) component numbers or emblems , e.g. CASE® and John Deere® are for reference reasons only and for indicating merchandise use and compatibility. Our organization and the outlined replacement parts contained herein are not sponsored, accredited, or made by the OEM.